maximum salinity for medium pressure boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :maximum salinity for medium pressure boilers
  • Supply Capacity : 10 units/month :maximum salinity for medium pressure boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Auxiliary Boilers - SlideShare

    Jun 08, 2018 · The boiler should be cleaned if the pressure loss lies approx. 20 mm WC above the pressure loss in a clean boiler.(At the specified MCR - Maximum Continuous Rating -of the engine, the total back pressure in the exhaust gas system after the turbocharger (as indicated by the static pressure measured in the piping after the turbocharger) must not Get Price

  • Industrial Flow Meter Applications - Smart Measurement

    When fly ash-laden flue gas flows from one or more boilers to multiple scrubber modules, a serious problem arises in balancing the flow to the modules so that each operates at its maximum efficiency. Poor scrubber performance not only increases the mass flow of pollutant to the atmosphere, but also clogs mist eliminators or re-heaters and Get Price

  • Auxiliary Boilers - SlideShare

    Jun 08, 2018 · The boiler should be cleaned if the pressure loss lies approx. 20 mm WC above the pressure loss in a clean boiler.(At the specified MCR - Maximum Continuous Rating -of the engine, the total back pressure in the exhaust gas system after the turbocharger (as indicated by the static pressure measured in the piping after the turbocharger) must not Get Price

  • Industrial Flow Meter Applications - Smart Measurement

    When fly ash-laden flue gas flows from one or more boilers to multiple scrubber modules, a serious problem arises in balancing the flow to the modules so that each operates at its maximum efficiency. Poor scrubber performance not only increases the mass flow of pollutant to the atmosphere, but also clogs mist eliminators or re-heaters and Get Price

Discount
7X24 Online