Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
The pulverized coal is blown into the boiler where it mixes with the supply of air for combustion. Heat is transferred to steam pipes located in the top region of the boiler, these being initially fed with hot water from the boiler feed pump; the hot water then gets converted to steam at high temperature and pressure.Get Price
Jan 17, 2019 · The rivet head used for boiler plate riveting is usually I a) Snap head C b) Pan head c) Counter sink head T d) Conical head E 4. In the assembly design of shaft, pulley and key, the weakest member is a) Pulley b) Key c) Shaft d) None of the above A 5.Get Price
The pulverized coal is blown into the boiler where it mixes with the supply of air for combustion. Heat is transferred to steam pipes located in the top region of the boiler, these being initially fed with hot water from the boiler feed pump; the hot water then gets converted to steam at high temperature and pressure.Get Price
The Dependence of the Efficiency of the Condensing Boiler by use and Climatic zone (1010 downloads) Studies on Variation in Arecoline Content of Arecanuts Collected from Different Parts of Karnataka (1009 downloads) Evolutionary Synthesis of Large Discrete Systems with Dynamic Structure (1009 downloads)Get Price